HOME  -  SITE INDEX

GALLERIES  -  FORUMS
 


My 1967 Ford F-100 2WD SWB pickup
Page 41

Stripping and Moving the F250 Cab

 

Sunday, March 6, 2005 - Getting the cab stripped down. It really didn't take that long...seeing as how many of these I've done over the past couple years, I'm getting pretty good at it. About the only things not removed were the underdash wiring harness and the seatbelts. The wiring harness will get left in while the cab is refurbished, though the belts will come out beforehand. Shown at left is the stripped-down cab, ready to be removed, and pictured below are a few more pictures taken during the day's activities:


Fig. 1

Fig. 2 - After removing the instrument panel, I saw this gold-colored box on the steering column brace....

Fig. 3 - ...and here's another shot of it from underneath. I believe this is part of the Camper Special wiring package.

Fig. 4 - Needless to say, this light switch is DOA.

Fig. 5 - One of the three cage nuts which holds the inner fender bracket is missing, so I'll have to just insert the bolt and use a nut and washer on the back side.

Fig. 6 - Here's another '67-only feature I found out today: the headliner trim on '67s is held on with these clips, in addition to the screws, which are the only means of attachment for '68-up trucks.

Fig. 7 - When removing the headliner, I found these small chunks of plywood wedged in between the inner cab wall the the roof. They each had a hole drilled in them and were held in place by the headliner screws.

Sunday, March 13, 2005 - Well, I spent the day at the shop today, and with the help of my father-in-law, we got the cab pulled from the F250 and set down onto my F100 chassis. His boom truck make short work of the task, which was a good thing, as just as we were getting started, a few snowflakes started coming down, which fortunately was the extent of the blizzard.

After lifting the cab off the F250 chassis, we rolled it out into the yard, then rolled the F100 chassis under the cab and lowered it down. Then we rolled the F100 and cab out a little further into the driveway so the F250 chassis could be put back into the shop. With a little creative rearranging, I was able to push it up against a wall so it'll be mostly out of the way until I decided what I'm going to do with it.

The F100 chassis was then rolled back into the shop and prepared for the next phase. I laid an old piece of carpet onto the back half of the frame, then laid down a couple sheets of plywood, and then a bunch of old couch cushions....and then rolled the cab onto it's back, giving me access to the bottom side. Next on the list of things to do will be to clean up the bottom and get it coated. I've decided to use Herculiner roll-on bedliner to coat both sides of the floorpans, for protection and rustproofing.


Fig. 8 - Using a boom truck we lifted the cab off the F250 chassis...


Fig. 9
- ...and set it down onto the F100 chassis.


Fig. 10 - The old cab that I'd been working on was hauled out back to the scrap iron pile.


Fig. 11


Fig. 12
- I had to rearrange things a little in the shop to give me room to push the F250 chassis back against the wall to be out of the way for the time being.


Fig. 13
- Once the cab was rolled back onto the cushions, it was a little wobbly, so I secured it to the chassis with a ratcheting tie-down.

Sunday, March 20, 2005 - I spent a good portion of afternoon today getting the bottom side of the cab cleaned up, mostly with the wire brush attachment and sandpaper discs on the angle grinder. I got everything cleaned up that could be reached with the angle grinder, all that's left now are all the nooks and crannies that can only be reached by hand with sandpaper. I didn't have my camera with me today to show the progress made, but I'll get something posted next time. Stay tuned!

Previous Page

Next Page
 

  FORDification.com WWW

All content on this site is © 1999-2008 by FORDification.com, unless otherwise noted.  All rights reserved.
No portion or content of this site may be reproduced or otherwise used without explicit permission.